Copy a Project (same flight diff day)

Hey All,

We have released the ability to “Copy” a project. The goal of this feature is set up a base project of the same site that is flown multiple times (mines, construction sites, etc). For the first flight, you would enter your information, projections, gcps, etc. Then on subsequent flights copy the project, upload your new data/photos and be of races. Everything but the LiDAR data will be copied and you’ll be ready to upload your new flight data.

There are two ways to Copy:

  • In the “All Projects” view, use the three dot menu, select “Copy”.
  • Inside a project, click the “copy” icon.

Hope this helps!

3 Likes